Congratulations to our company promoted to the largest "South China Poly Real Estate" floor coatings class supplier! I warmly congratulate carborundum wearable Floor material sales first!

24-hour service hotline:

4000-011-480

Alibaba QR code

WeChat public number

24-hour service hotline:4000 011 480
Tel:0750-3613461    Fax:0750-3613461-5
Email:
jddp666@163.com    Alibaba:https://jdtl66.1688.com/    Web:http://www.jddipi.com/
Address:18th Floor, Lile Wudong Village, Jianghai District, Jiangmen City, Guangdong Province, China (Edited by A01 Factory)

Office Address: No. 159, Lexiang East Road, Wudong Village, Lile Town, Jiangmen City

Q Q:

Click here to send me a message Click here to send me a message Click here to send me a message

  Aliwangwang: Click here to send me a message

 

Main business: floor paint, carborundum wearable Floor, concrete sealer, and other flooring materials
Web CopyR
ight © 2019 Guangdong Jiangmen Jie Da Coating Material Ltd.    All rights reserved.   粤ICP备11005041  Powered by www.300.cn  

Links: Google  MadeInChina  CE  Floor paint Integrated wall panels  Charcoal floor Waterborne epoxy zinc-rich primer

Search Keyword:Hardened wear-resistant flooring,Epoxy floor paint coating,Sports stadium, PVC plastic,Parking Floor

Services

Adopting imported production

automation control equipment, we as

sure you to choose suitable flooring materials!

Production Automatic Control

Produce & Market by Ourselves

We can make precise and detailed

standards and provide quality service

for customers with producing and

marketing all by ourselves.

Rich Industry Experience

Jida Paint has more than one

undergraduate engineer, and a group of experienced and skilled builders!

浏览量:

If you want to get the perfect floor design and construction plan, we will provide you with the best quality service!

We believe that: high-quality products + professional construction + excellent service = high-quality engineering

1. Pre-construction site investigation

/ Before formulating the construction plan, the company organizes professional engineers to go to the construction site for investigation, including: ground condition, foundation completion time, drying degree, smoothness, strength and other project conditions.

II. Establishment of construction plan and quotation

/ According to the survey results and referring to the customer's opinions, the basic materials and detailed design schemes, surrounding environment and construction environment are formulated. The plan is based on the special knowledge of color. The selection of budget and construction personnel is to convene relevant technical personnel to study the rationality and feasibility of the scheme and form the final construction scheme.

3. Determining Project Leader and Project Management Regulations

/ To appoint project managers, first of all, they must be familiar with the detailed construction steps, organize professional construction teams and implement construction equipment according to the construction requirements, and make all preparations before construction. The project manager is fully responsible for the project quality, safety and accident-free.

IV. Signing of Contracts between the Parties

/ In accordance with the principle of fair trade, the two parties sign contracts to negotiate and stipulate the cost of construction, the mode of contract, the duration of the project, the payment and settlement of the project funds, the liability for warranty, the liability for breach of contract and the safety liability of both parties.

V. Engineering Construction

/ In strict accordance with the provisions of the contract, we arrange for the entrance of paint products, construction machinery and equipment and construction personnel. The project management team established by the project manager implements the project management, and does a good job of communication, coordination, submission of reports and other work. The technical manager carries out on-site analysis and timely solution of the quality problems and technical problems arising in the construction process of each project to ensure the smooth and successful completion of the project.

6. Acceptance and settlement of projects

According to the signed construction contract, Party A accepts the project and settles the related project funds.